The client has multiple View/Deliver environments to upgrade. From level 11.0 to level 11.6 and then fFrom level 11.6 to currently-supported level 12.2.
Release : View/Deliver 12.2
When upgrading View/Deliver, the following process needs to be done, as would be used with most output management products:
. Install the product
. Update procs
. Update JCL, including anything referencing the load library
To back up a View or Deliver database, to a flat file, use:
. SARDBASE UNLOAD
. RMODBASE UNLOAD
The historical upgrade path is to upgrade View first, then Deliver, as Deliver is downward compatible. Unique to View/Deliver upgrades is the VERSIONing of a database to the new code level.
For View 11.0, the recommendation is to:
. Bring the code level up to 11.6.
. Run SARDBASE VERSION 11.6, to bring the database to the 11.6 level.
. Run SARDBASE OLOAD, to load the 11.6 panels to the database.
For View 11.6, the recommendation is to:
. Bring the code level up to 12.2.
. Run SARDBASE VERSION 12.2, to bring the database to the 12.2 level.
. Run SARDBASE OLOAD, to load the 12.2 panels to the database.
For View 12.0, the recommendation is to:
. Bring the code level up to 12.2.
. Run SARDBASE VERSION 12.2, to bring the database to the 12.2 level.
. Run SARDBASE OLOAD, to load the 12.2 panels to the database.