Is there a way to run the scheduled reports manually in CA Performance Management if they did not run ?
book
Article ID: 132824
calendar_today
Updated On:
Products
CA Infrastructure ManagementCA Performance Management - Usage and Administration
Issue/Introduction
We had a problem with Data aggregator disconnecting with Data repository due to which we have to run all the scheduled reports manually one by one.We
would like to know if there is a script to run all the scheduled reports at one time.
Environment
CA Performance Management 3.7
Cause
Data aggregator disconnecting with data repository which results in scheduled reports failing. The scheduled reports have to be generated manually one by one.
Resolution
The scheduler is looking at only the timestamp for each job. As of now, there is no way to run the jobs manually except for changing the time manually.