The Default Allocation % value of the resource fulfilling a requisition does not match the original role's Default Allocation %

book

Article ID: 131231

calendar_today

Updated On:

Products

CLARITY PPM FOR ITG CLARITY PPM FEDERAL Clarity PPM SaaS Clarity PPM On Premise

Issue/Introduction

STEPS TO REPRODUCE 
1. Create a project with dates 23/04/19 till 23/09/19
2. Add a role as a team member to the project
3. Update the Default allocation % to be 0
4. On the Team > Detail tab > Add 20 hours of allocation in May 2019
5. Check the Team member allocation segments:
   0% up to the 30th of April
   10.87 % for May
   0% for the rest
   Default Allocation % is 0
6. Select the team member and create a requisition
7. Add a resource to fullfill the requisition and book it
8. Go back to the Team tab and check the resource allocation segments:
   0% up to the 30th of April
   10.87 % for May
   0% for the rest
   Default Allocation % is 2.20
   
Expected results: Allocation Segments are the same and so is the Default Allocation % value
Actual results: Allocation Segments are the same, but the Default Allocation % value differs

Cause

This is caused by DE48736

Environment

Release:
Component: PPMSTU

Resolution

This is currently being analyzed by Engineering