Clarity PPM - Color coding on Capacity vs Allocation incorrect
book
Article ID: 127859
calendar_today
Updated On:
Products
CLARITY PPM FOR ITGCLARITY PPM FEDERALClarity PPM SaaS - ApplicationClarity PPM On Premise
Issue/Introduction
On the report Capacity vs Allocation by OBS the color coding on the Grand Totals lines may be incorrect.
It is related to only columns 5 and 6 and is only apparent in certain situations.
Cause
CAPACITY VS ALLOCATION BY OBS COLUMN 5 and 6 for Grand Total have wrong color coding
Note this could only be recreated with the exact STR and Allocation amounts. Columns 1-5 are all overallocated Column 6 is underallocated Column 7 is overallocated
STR.
1. Choose a resource (I used lw) - Make sure they have a Department 2. Since I did this is Feb and the first month on the report is Feb I made these allocations I used 4 projects but made sure the total allocations for all 4 projects met the above criteria by period. Basically all overallocated except Jul (column 6) Feb: 200 Mar: 200 Apr: 180 May: 552 Jun: 480 Jul: 150 Aug: 2,288
3. Make sure time slicing runs 4. Run LDW (I ran full) 5. Open report Capacity vs Allocation by Resource OBS report 6. Fill in Input Controls - OBS Type - OBS Unit - I populated the resource - Left Default Start Date (2019-02-01) - Period Type: Month - Unit Type: Hours - Group by: OBS Level 1
Expected Result: Grand Total shows correct color coding for columns 5 and 6 Actual Result: Grand Total color coding is backwards for columns 5 and 6