Clarity PPM - Color coding on Capacity vs Allocation incorrect

book

Article ID: 127859

calendar_today

Updated On:

Products

Clarity PPM SaaS Clarity PPM On Premise

Issue/Introduction

On the report  Capacity vs Allocation by OBS  the color coding on the Grand Totals lines may be incorrect.

It is related to only columns 5 and 6 and is only apparent in certain situations.

Cause

CAPACITY VS ALLOCATION BY OBS
COLUMN 5 and 6 for Grand Total have wrong color coding


Note this could only be recreated with the exact STR and Allocation amounts.
Columns 1-5 are all overallocated
Column 6 is underallocated
Column 7 is overallocated


STR.

1. Choose a resource (I used lw)
- Make sure they have a Department
2. Since I did this is Feb and the first month on the report is Feb I made these allocations
I used 4 projects but made sure the total allocations for all 4 projects met the above criteria by period. Basically all overallocated except Jul (column 6)
Feb: 200
 Mar: 200
 Apr: 180
 May: 552
 Jun: 480
 Jul: 150
 Aug: 2,288
 
3. Make sure time slicing runs
4. Run LDW (I ran full)
5. Open report Capacity vs Allocation by Resource OBS report
6. Fill in Input Controls
- OBS Type
 - OBS Unit
 - I populated the resource
- Left Default Start Date (2019-02-01)
 - Period Type: Month
 - Unit Type: Hours
 - Group by: OBS Level 1


Expected Result: Grand Total shows correct color coding for columns 5 and 6
Actual Result: Grand Total color coding is backwards for columns 5 and 6


 

Environment

Release: CODFSS99000-15.4.1-PPM SAAS FedRAMP-Sandbox-Small Environment
Component:

Resolution

This was reported as DE47571 and the fix is targeted for 15.6