Why do I have to execute AAX1HOLD job before all the other SMP/E install jobs?
search cancel

Why do I have to execute AAX1HOLD job before all the other SMP/E install jobs?

book

Article ID: 12583

calendar_today

Updated On:

Products

Datacom DATACOM - AD

Issue/Introduction

Executing the CA Datacom/AD 15.0 SMP/E installation procedure, the job that downloads the ERROR and FIXCAT HOLDDATA from CA Support Online is executed before any other SMP/E job.



Is there a reason you have to run AAX1HOLD before AAX2CSI, AAX3RECD, AAX4APP and AAX5ACC?

Environment

Release:
Component: AD

Resolution

From CA Datacom/AD 15.0 Install documentation:

5.  Submit AAX1HOLD. This job produces the following results:

    • This member downloads the error and fixcat HOLDATA from CA Support Online.
    • It allocates data set HLQ.CAI.ERROR.HOLDDATA upon successful execution.
    • The output of this job is used by the SMP/E receive job AAX3RECD, which uses it as input into the environment.

So AAX3RECD job requires the HOLDDATA data set created by AAX1HOLD, therefore AAX1HOLD must be executed first. 

Additional Information

See CA Datacom/AD 15.0 Install documentation here.