The project will not be included in the report results if the 'Status Reporting' field on the project is blank. The 'Status Reporting' field uses a lookup with the values: Not Required, Optional, Required.
Once a value is selected on the project, and the Load Data Warehouse job runs, the project will show up on the results of this report.