STEPS TO REPRODUCE: 1. Login and navigate to Projects 2. Create a New Project for 2 week 3. Associate the project to a rate matrix 4. Add resource to the team - Make sure the resource is included in the matrix 3. Make the allocation 10 hours for 1 week. 4. Run Rate Matrix job with first 3 options 5. Run the Update Cost Totals from the Team tab
Expected Result: The allocation cost should be calculated based on (Allocation * Rate per hour).
Actual Result: The cost is incorrectly calculated Alocation * Rate / 3600.