Newly created Risk has Response Strategy populated from an existing Risk
book
Article ID: 106781
calendar_today
Updated On:
Products
Clarity PPM SaaSClarity PPM On Premise
Issue/Introduction
Newly created Risk has Response Strategy populated from an existing Risk.
Steps to Reproduce: 1. Select a program 2. Select the Risks/Issues/Changes tab 3. Click on New (to create a Risk) 4. Enter required fields: Risk name and Risk ID, Response Type 'Watch', and Save. 5. Select 'Response Strategy' from the newly created Risk's Properties tab. 6. Enter a long Response Strategy 7. Enter a value for 'Assigned To' 8. Click Add 9. Get error 'Value contains illegal UTF-8 characters. Value is too large.' 10. Reduce the number of characters in Response Strategy 11. Click Add, and the Risk is created. 12. Repeat step 3 to 5.
Expected Result: Response Strategy is blank on the newly created Risk. Actual Result: Response strategy contains the long value (from step 6) which resulted in error Value is too large.
Environment
CA PPM release 15.1
Resolution
This is defect DE41153, and is fixed in CA PPM release 15.5.